Skip to main content

Box-folder 9 / 7

 Container

Contains 1 Result:

Final construction reports on Section 42-A3, Section 42-B4, and Section 42-C6 grading and bridge widening; Section 42-C5, Section 42-D3, Section 42-E4, Section 42-F4, Section 42-G3, Section 42-H4, Section 42-I3 and Section 42-J4 surfacing and bituminous surfacing; Section 42-J5, Section 42-K1, Section 42-K2 and Section 42-I3 grading, surfacing and bridges; Section 42-J6, Section 42-K3 and Section 42-I4 bituminous paving; and Section 42-M2 grading, surfacing and bridge widening, 1956, 1960, 1962, 1964

 File — box-folder: 9 / 7
Scope and Contents From the Collection:

These records consist of progress and final reports generated in the course of construction of various Forest Highway Project in Montana. These reports consist of financial records, correspondence regarding specific construction-related topics, photographs, maps, and engineering drawings. Oversize financial records and maps from each folder have been removed to oversize storage. Photographs of the 1959 Madison Canyon earthquake have been transferred to the Photo Archives.

Dates: 1956, 1960, 1962, 1964